Urban green infrastructure in Hong Kong must begin with verified project facts, not a product claim. A useful case study should separate the building identity, the documented green features, the proposed drainage and planting systems, and the records that prove what was installed.
This guide reviews the legacy article about The Arch at Kowloon Station. It keeps the four existing body images unchanged. However, it does not treat those images, their existing alt text or the earlier marketing copy as independent proof that HOENSOEY Cells or HT-508 trays were used at the development.
In this guide

What Hong Kong guidance actually establishes
Hong Kong’s Buildings Department APP-152 Sustainable Building Design Guidelines addresses building separation, building setback and site coverage of greenery. Its objectives include better air ventilation, more greenery and heat-island mitigation. The note is a design-control reference; it does not prove that a named existing property uses a specific tray or drainage module.
In addition, BEAM Plus provides independent assessment criteria covering issues such as climate resilience, site ecology, water use, energy, materials, health and operations. A project should not be described as BEAM Plus certified unless it appears in the applicable directory or a valid certificate is available.
Urban green infrastructure in Hong Kong: claim matrix
On small screens, scroll horizontally to read every column.
| Proposition | Current public evidence | Required project gate |
|---|---|---|
| The building is The Arch at Kowloon Station | Developer history and annual-report references support the identity | Use the official English project name and address in project records |
| The development includes a sky garden | The HKGBC-hosted high-rise sky-garden study includes The Arch | Confirm the relevant level, assembly and present operating condition |
| HOENSOEY Cells were installed | Not established by the reviewed public project sources | Approved drawings, material submission, purchase record and dated installation evidence |
| HT-508 trays were installed | Not established by the reviewed public project sources | Tray schedule, invoice, roof layout, photographs and handover record |
| The systems reduced runoff, energy use or cost | No project-specific baseline or monitored result was found | Defined boundary, period, method, baseline and measured operating data |
Start with a project-specific design brief
First, define what the roof or landscaped deck must achieve before selecting urban green infrastructure products. Objectives may include safe drainage, temporary runoff detention, planting, amenity, irrigation reuse or heat mitigation. In each case, set a measurable acceptance criterion and name the responsible designer.
Structure, waterproofing and access
Next, ask the structural engineer to confirm dead load, saturated load, maintenance load and any temporary construction load. Then coordinate root protection, waterproofing compatibility, inspection zones, safe access, wind design, fire strategy and emergency overflow. A green feature must not obstruct outlets or conceal defects.
Rainfall, outlets and exceedance
After that, use the project’s approved rainfall basis and drainage standard. Check primary outlets, emergency overflow, surface falls, blockage scenarios and a safe exceedance route. Therefore, retention or detention does not remove the need for conventional drainage capacity.

Separate product data from project adoption
For urban green infrastructure, product pages are only one part of the evidence chain. For example, the current HOENSOEY Cells product page publishes supplier reference values for module geometry, void ratio, loading and flow. Likewise, the current HT-508 page publishes tray dimensions, weight, material and water-retention references. However, these pages do not prove use at The Arch and do not replace a current model-specific technical submission.
Geocellular drainage or storage modules
Request current drawings, material declaration, traceable structural tests, design-life basis, joint details, hydraulic data and installation limits. Then verify the configuration for the actual load, depth, liner or geotextile, water quality, inspection and maintenance conditions.
Modular green-roof trays
Similarly, check tray depth, saturated weight, drainage path, water-retention setting, growing medium, plant palette, irrigation, edge restraint and wind resistance as one assembly. Supplier tray data alone does not establish whole-roof thermal, biodiversity or stormwater performance.

Installation and commissioning records
- Approve the coordinated design. Record roof zones, levels, outlets, overflow, inspection access, waterproofing interfaces and product locations.
- Inspect the substrate. Confirm falls, surface condition and waterproofing acceptance before covering the roof.
- Verify delivered materials. Match model, batch, quantity and supporting documents to the approved submission.
- Record the installation. Keep dated photographs, inspection requests, hidden-work sign-offs and any departures from the drawing.
- Test before handover. Demonstrate drainage, overflow, irrigation, accessible inspection points and the agreed maintenance tasks.
Measure outcomes instead of assuming benefits
Urban green infrastructure in Hong Kong can support several objectives, but a case study should report only measured outcomes. For runoff, record rainfall, inflow or roof area, discharge and monitoring period. When assessing irrigation reuse, record storage volume and actual demand. Likewise, define the comparison surface, weather, occupancy and measurement method for thermal or energy claims.
Finally, claims about property value, air quality, biodiversity or resident wellbeing also need a defined baseline and suitable evidence. Without those records, describe the feature and its intended function rather than presenting an achieved result.

Questions for a Hong Kong case-study review
Can this page be treated as a verified HOENSOEY project reference?
Not yet. The public sources reviewed verify The Arch identity and a sky-garden reference, but they do not verify the two HOENSOEY product adoptions. The product claim needs project records before it should be used in a tender, portfolio or performance statement.
Does Hong Kong guidance prescribe a particular product?
No. The cited guidance and assessment framework address design outcomes and sustainability criteria. Product selection still requires project-specific design, compliance evidence and approval.
Why is the earlier 2004 completion statement removed?
The developer’s public record places the sale in 2005, expected completion in late 2005 and buyer possession in the first half of 2006. This guide therefore avoids the unsupported 2004 completion date.