In this article
Technical design guide · Updated July 2026
An underground storage system should never be selected from cubic metres alone. Its purpose, loading, ground conditions, flow controls, access strategy and installation method all have to work as one design.
Confirm nine items: the hydraulic purpose, design storage volume and discharge rate, surface loads, soil and groundwater conditions, tank geometry, wrapping method, inspection and maintenance access, installation details, and the supplier evidence required for approval. Product strength matters, but it is only one part of a safe, serviceable system.

Effective underground rainwater storage design begins before road levels, landscape areas and service corridors have been fixed. When storage appears late in a project, coordination becomes harder. The better approach is to define what the system must do before choosing a crate: temporarily hold runoff, infiltrate it into suitable ground, retain it for non-potable reuse, or combine more than one function.
England’s current National standards for sustainable drainage systems, for example, describe SuDS as a way to slow and store runoff while also creating opportunities for water reuse, water-quality improvement and wider environmental benefits. The exact regulations differ by country and municipality, but the underlying lesson travels well: storage should be designed as part of the whole drainage strategy, not as an isolated product purchase.
First decide what the stored water is meant to do
The same modular crate may sit inside any of these systems, but the lining, pretreatment, pipework, overflow arrangement and maintenance plan will be different. A geotextile-wrapped soakaway is not interchangeable with a geomembrane-lined harvesting tank.
Nine checks that belong in the pre-specification review
1. State the hydraulic purpose in one sentence
A useful brief begins with a clear operating statement: “Store the design-event runoff and release it at no more than the permitted discharge rate,” or “Capture roof runoff for irrigation, with overflow routed to the approved drainage point.” This prevents attenuation, infiltration and reuse terminology from being mixed later in the tender.
2. Calculate usable storage, not nominal box volume
The required volume should come from the project’s drainage model, rainfall data, contributing catchment, runoff coefficients, climate allowance and permitted outflow. When converting that requirement into module quantities, use the declared net water volume or void ratio rather than the gross external dimensions alone. Also allow for pipe intrusions, inspection chambers, sediment zones and any unusable volume defined by the designer.
3. Separate hydraulic sizing from structural verification
A tank can have enough volume and still be unsuitable beneath a road. Structural review should cover surface use, axle or wheel loads, construction traffic, cover depth, lateral earth pressure, groundwater effects, load spread through pavement layers, number of crate layers and long-term material behaviour. Short-term compression results are useful evidence, but they should not be treated as a complete buried-structure design.

4. Investigate soil, groundwater and contamination risk
For infiltration, field testing should establish whether the soil can accept water at an appropriate rate. The designer should also review the seasonal high water table, nearby foundations, slopes, basements, retaining structures and contaminated land. Where infiltration is unsuitable, a lined attenuation or harvesting arrangement may be the more defensible route.
5. Fit the geometry around real site constraints
Modular units make it possible to trade length, width and depth, but the layout still needs adequate clearance from structures and services. Check excavation batters or shoring, working space for wrapping, pipe invert levels, tank access and the depth available beneath the final surface. A shallow, wider layout may reduce excavation depth; a deeper layout may preserve more plan area but increase structural and construction demands.

6. Match the wrapping build-up to the application
A typical attenuation or harvesting tank uses a waterproof geomembrane protected by geotextile, with seams and penetrations completed to the membrane designer’s requirements. A soakaway generally uses a permeable geotextile selected for filtration and site conditions. In both cases, the wrapping is a system component, not packaging: puncture protection, jointing, corners, pipe boots and testing all deserve specification clauses.
7. Design for inspection, sediment control and maintenance
Fine sediment should be intercepted before it occupies storage or restricts flow. Depending on the catchment, this may require silt traps, catch pits, oil separation or other pretreatment. Provide practical access to inlets, outlets, flow controls and inspection points. The maintenance owner, interval and safe access method should be recorded before handover.
8. Treat the base and backfill as structural components
Modules require an even, stable formation and the specified bedding. Sharp projections, poorly compacted fill and uncontrolled construction loading can damage an otherwise suitable system. Installation documents should define formation acceptance, bedding, wrapping sequence, connector placement, perimeter panels, backfill material, compaction method and when construction plant may cross the completed area.
9. Request evidence that matches the actual version supplied
The submittal should identify the exact material grade and product version, not only the family name. Ask for dimensional data, material information, short-term vertical and lateral test results, creep or long-term design information, production quality controls, traceability, installation guidance and relevant third-party reports. For imported systems, packing configuration and delivery sequencing also affect site risk.
M2025 data to use at the enquiry stage
The M2025 modular underground water storage system is available in ECO recycled-PP and ULTRA virgin-PP versions. The following values are a manufacturer data snapshot for early comparison; they do not replace the project engineer’s calculations or the full test reports.
Swipe or scroll horizontally to read the full table on smaller screens.
| Item | Published M2025 data | How to use it |
|---|---|---|
| Plan size | 1000 x 500 mm | Develop the tank grid and excavation footprint. |
| Component / assembled height | 250 mm component; 500 mm assembled tank | Coordinate formation, pipe inverts, cover and final level. |
| Gross / net volume | 0.25 m³ gross; approximately 0.23 m³ net per crate | Use the engineer-approved net value when converting storage volume to quantity. |
| Void ratio | Approximately 95% | Supports efficient below-ground storage; allow for system intrusions. |
| ECO positioning | Recycled PP; stated 45 t/m2 short-term performance | Review against the required loading and design life. |
| ULTRA positioning | Virgin PP; stated >600 kN/m2 vertical and >150 kN/m2 lateral short-term compression | Request the applicable reports and long-term design basis. |
| Accessories | Side panels, top covers, vertical and horizontal plugs | Include them in the bill of materials and installation sequence. |
Use regional language without confusing the engineering
The same design family is described as SuDS in the United Kingdom, sustainable drainage more broadly in Europe, LID or green infrastructure in North America, and WSUD in Australia and parts of Asia-Pacific. Search terminology changes by market, but procurement documents should still define the function precisely: controlled discharge, infiltration or water reuse.
Frequently asked questions
Is a high void ratio enough to select a modular storage system?
No. Void ratio affects storage efficiency, but selection also requires hydraulic sizing, structural verification, ground assessment, suitable wrapping, access, maintenance and an installation specification.
Can the same crate be used for attenuation and rainwater harvesting?
Potentially, yes. The application is determined by the complete system. Attenuation needs controlled discharge; harvesting needs watertight containment, appropriate treatment and a permitted reuse arrangement.
What test information should a specifier request?
Request results for the exact product version, including short-term vertical and lateral compression, long-term or creep data, test conditions, material identification and the design method used to convert test performance into allowable project loads.
Who should approve cover depth and traffic loading?
The responsible project engineer should approve them against local requirements and the complete pavement, soil, groundwater and tank design. A product data sheet alone is not approval for a trafficked installation.
Need M2025 data for a project review?
Send the project location, required net storage volume, tank footprint or depth limit, surface loading, cover depth and intended function. HOENSOEY can provide the relevant M2025 datasheet, available test documents and a preliminary bill of materials for engineering discussion.
This article provides general pre-specification guidance and is not a project design, regulatory approval or substitute for advice from the responsible engineer.